Ninian Central
In the early 1970’s, 1.8 million tonnes of Torridonian Sandstone was blasted out of the mountainside to create the dry dock and Howard Doris Ltd started to build the Ninian Central oil platform in August 1975 for Chevron Petroleum (UK) Ltd. Over 3,000 people were employed to construct the concrete platform. They were locally called the “Kishorn Commandos” and lived in a camp on the site. Due to planning and travel constraints, the location was considered an island so all materials and employees were brought in by sea or air.